Restoration Work Begins

Arrival of Scaffolding
After years of fund-raising, the arrival of scaffolding at the Tower site marks the beginning of the restoration work.
Suzi Shed
A new maintenance shed for the Library had to be built as the bottom floor of the Tower could no longer be used for such a purpose. Pictured here are Suzi Fraser, coordinator and fundraiser for of the Chester Trust’s restoration project, and Glen MacLeod, librarian/custodian of the Library and first-time shed builder.
Excavation 1
Before any work on the Tower can begin, the ground around the Tower must be made level and a bed of gravel laid down to act as a foundation for the scaffolding. Here, the crew from Oceanview Landscaping remove excess soil.
Next comes the gravel.
Next comes the gravel.
The base is complete and ready for the scaffolding.
The base is complete and ready for the scaffolding.
Tower Oct 8 2013
The scaffolding is up and the old shingles have been removed. To the left of the first floor door, some of the rotten diagonal boards have been replaced as well as the heavy wooden beams that form the base of the Tower walls.

Advertisements

1 Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s